What Are the New ADU Laws in California for 2026?

By Wise Choice Remodeling Team November 7, 2026

California’s newest ADU changes come from 2025 legislation that took effect between June 30, 2025 and January 1, 2026. The ones homeowners notice most: permit agencies must rule on whether an ADU application is complete within 15 business days, ADU size limits are now measured by interior livable space, and a junior ADU needs an owner living on the property only if it shares a bathroom with the main house.

The source is the state Department of Housing and Community Development’s ADU Handbook, updated in March 2026, which lists five bills from 2025: AB 1154, SB 9, SB 543, AB 462 and AB 130. Here is what they changed, and what it means if you are planning an ADU now.

The changes that matter for a homeowner

Change What the law now says Government Code section
Completeness check The permitting agency decides whether an ADU or junior ADU application is complete and gives written notice within 15 business days; if incomplete, it lists what is missing and how to fix it 66317(a)(2); 66335(a)(2)
Appeals An applicant can appeal an incompleteness finding or a denial, and the agency gives a final written decision within 60 business days of the appeal 66317(d); 66335(e)
Size limits Measured by the interior livable space of the ADU or junior ADU 66321(b)(2) and (b)(3); 66313(d)
Impact fees None from the city or county, a special district or a water company on an ADU of 750 square feet of interior livable space or less, or a junior ADU of 500 or less; above 750, charged in proportion to the main house’s square footage. School districts may still charge fees on units over 500 square feet 66311.5(c)
Junior ADU owner occupancy Required only if the junior ADU shares sanitation facilities with the main house 66333(b)
Junior ADU rentals No short-term rentals; if rented, the term must be longer than 30 days 66333(g)
Fire sprinklers Sprinklers cannot be required in a junior ADU if they are not required for the main house 66323(d)
Local ordinances A local ADU or junior ADU ordinance not sent to the state within 60 days, or whose city or county does not answer the state’s findings within 30, is null and void, and state ADU law applies until a compliant ordinance is adopted 66326(d); 66333.5

Changes for specific situations

Situation What changed
Property in the coastal zone The coastal development permit for an ADU must be approved or denied within 60 days of a complete application (Government Code 66329(a))
Home destroyed in a declared emergency In a county under a Governor’s emergency proclamation made on or after February 1, 2025, the local agency must issue a certificate of occupancy for a detached ADU before the main house has one, if conditions are met, including that the main house was substantially damaged or destroyed in that event (Government Code 66328)
Deed restrictions and CC&Rs Reasonable restrictions on ADUs in a deed, contract or other instrument cannot include fees or other financial requirements (Civil Code 714.3(b))

Renumbered sections

The 2025 legislation also moved three sections of the ADU law. Section 66324, on fees, is now 66311.5; section 66327 is now 66313.5; and section 66332, on legalizing ADUs built without a permit before 2020, is now 66311.7. The rule itself did not change, only a cross-reference was updated, so older articles citing section 66332 still describe it correctly, under the old number. What happens if you build an ADU without a permit covers that rule.

Compact kitchen with white cabinets and open shelving in a small dwelling unit

What this means if you are planning an ADU now

An application should get a completeness answer within 15 business days, about three weeks, and if something is missing, the notice has to say what and how to fix it. Completeness is only the first step: in the City of Los Angeles, the median ADU permit issued in 2025 took 122 days from submission to issue (LADBS permit data). Plan sizes against interior livable space. And if the unit stays at 750 square feet of interior livable space or less, the city or county, special districts and water companies cannot charge impact fees on it, though school district fees on units over 500 square feet and utility connection fees are separate matters. For the basics of what counts as an ADU, see what an ADU is under California law.

How we handle it

We design, permit and build ADUs under the current state rules, and in the City of Los Angeles through ADU construction in Los Angeles.

Keep Reading

Related Articles

Stucco house with white window trim, a clay tile roof and orange painted front steps

Exterior Painting

How Much Does Exterior Painting Cost in Los Angeles?

Exterior painting in Los Angeles typically costs $7,500 to $12,000 for a 1,500 sq ft one-story home, $9,000 to $14,000 […]

Read More
What Are the Alternatives to Repiping a House?

Home Repiping

What Are the Alternatives to Repiping a House?

Four alternatives to repiping a house are covered here: replacing only the failing section (a partial repipe), repairing a single […]

Read More
How Long Do Permits Take in Los Angeles? LADBS Permit Data, 2020 to 2026

Home Remodeling

How Long Do Permits Take in Los Angeles? LADBS Permit Data, 2020 to 2026

In 2025 the City of Los Angeles issued 6,621 building permits that created an accessory dwelling unit on a one- […]

Read More

Thinking About Building an ADU?

Get a free in-home assessment from a licensed Los Angeles general contractor. We look at your lot, your utilities and what the code allows before you commit to anything.

Call Now Get a Quote